+8615905360672

huaquan@huaquanpower.com

SHANDONG HUAQUAN POWER CO.,LTD

News > Huaquan generator set crankshaft installation method

Huaquan generator set crankshaft installation method

2024-09-11 15:58:35Font scaling:

Huaquan generator setcrankshaft installation method mainly includes the following steps:
 
1. Preparation: Before starting installation, make sure all tools and parts are clean and meet specifications. Check the crankshaft for cracks or wear, and ensure that the bearings and journals are well matched. Use special lubricating oil to lubricate the crankshaft to reduce friction during installation.
 
2. Install the bearing: When installing the bearing, be sure not to slide directly left and right to prevent the bearing seat from slipping. This step is very important and requires special care.
 
3. Oil injection lubrication: Oil is injected into the holes in the bearing to lubricate the rotation before starting. This step is to ensure that the crankshaft can run more smoothly at start-up.
 
4. Install the crankshaft: Carefully place the crankshaft on the main bearing seat of the engine, ensuring that each journal of the crankshaft is correctly aligned with the corresponding bearing hole. Use special tools and equipment, such as crankshaft installation tools, to help accurately align and stabilize the position of the crankshaft.
 
‌5. Install the bearing cap: When installing the bearing cap, you need to install the bearing bushing first and fill the bearing bushing with oil. This ensures a closer contact between the bearing cap and the bearing bushing, improving the stability and reliability of the engine. ‌


6. Tighten the crankshaft: Use the main bearing cap and bolts to fix the crankshaft. Tighten the bolts according to the torque value recommended by the manufacturer. Usually this process needs to be done several times to ensure uniform force. During the tightening process, a torque wrench can be used to ensure that the torque value of each bolt is consistent. ‌

7. Check and adjust: After installation, check the rotation of the crankshaft to ensure that it rotates smoothly and unobstructed. Use a micrometer or similar precision measuring tool to check the axial and radial clearances of the crankshaft to ensure that they are within the allowable tolerance range. ‌

8. Install other components: After the crankshaft is installed and checked, you can continue to install other related components such as connecting rods, pistons, flywheels, etc. The installation of each component should be carried out strictly in accordance with the manufacturer's instructions to ensure the assembly quality of the entire engine. ‌

Through the above steps, it can be ensured that the installation of the crankshaft of the Huaquan generator set is both accurate and reliable, laying a solid foundation for the long-term stable operation of the engine.
For more information, please visit: http://www.fadianjisos.com/news/

Weifang, shandong province, China 中国 山东。潍坊

     Sales hotline: +8615905360672
         WhatsApp: +8615905360672
   Email address: huaquan@huaquanpower.com
  Official website: https://www.huaquanpower.com
Production Base: No. 11666 Guting Street, Economic Development Zone,
                            Weifang City, Shandong Province
Company Name: SHANDONG HUAQUAN POWER CO.,LTD

Shandong Huaquan Power Co., Ltd.